E. Highwood Building

This parking lot was in need of a full pulverization of the existing asphalt, we have completely repaved the area and restriped back to the original configuration. The catch basins are being repaired, and installing an asphalt spillway for proper drainage. We are to still replace the asphalt curbing that has been removed, so far so good! Great job ASI and all others who were a part of this project!