AD Transport

Project Name: AD Transport
Project Location: Canton, MI
Year Completed: 2018

This job was done in four phases. Each phase required excavation and installing 3 inches of #3C leveling course asphalt. Concrete dolly pads and catch basins were adjusted and the entire lot was re-striped. 

Services Used:

  • Asphalt Excavation
  • Asphalt Paving
  • Rip Rap Installation with geofabric
  • Concrete dolly pads
  • Striping and catch basin adjust